arrow-left-lightarrow-left-thinarrow-right-lightarrow-right-thinarrow-rightbriefcaseclose-4closedownload-2download-3downloademail-2emailenvelopeexpand-buttonlinklocklogo-carronpadlock-2padlockpager-arrow-leftpager-arrow-rightsearchsharesocial-facebooksocial-instagramsocial-linkedinsocial-pinterestsocial-twittersocial-whatsappsocial-youtubetimes

MODERNIZATION OF THE “SP EX SS 415 PAULLESE” PROVINCIAL ROAD AT CREMA – SPINO D’ADDA – 2nd PHASE

InfrastructureInfrastrutture

The project concerned the 2nd phase of the modernization of the “SP ex SS 415 Paullese” provincial road, in the section between the bridge over the river Adda, in the municipality of Spino d’Adda, and the intersection with the “SP ex SS 472 Bergamina” provincial road, which had already been redeveloped as part of the 1st phase of the work, in the municipality of Dovera. The new section was built partly as a bypass for approximately 3 km, and partly along the original roadbed for approximately 4 km, crossing through the territories of the municipalities of Spino d’Adda, Pandino and Dovera. A secondary road along the route made it possible to eliminate the intersections on level with the present “Paullese” provincial road, connecting the interchange junctions with the main roads and permitting reconnection of the private farm roads intersected by the main road.

  • Contracting entityProvincia di Cremona
  • Place Crema (CR) view map
  • Work start date22/07/2013
  • Work end date16/06/2015
  • Type of workInfrastrutture