ConstructionNuovo complesso direzionale
The project includes, first of all, the demolition of the existing buildings, which occupy the whole perimeter of the lot, consisting in 9 above-ground levels and two underground floors.
Then, a new office building will be implemented, consisting of 2 floors below-ground which will be used as garage and technical premises, with a gross surface area of 3,870 square metres per floor, and an above-ground area divided into three interconnected buildings that rise up 8, 11 and 14 floors respectively, with a gross surface area of 22.700 square metres. On the inside, the building opens up on two main halls, where the main staircases of the complex are located. The shape of the ground floor can thus allow both to divide the building in two big sections and to use one of the abovementioned halls, if case be, as the main one and, accordingly, the other one as the secondary one. The first floor of the complex has a hybrid shape, divided in office premises and meeting areas, while the remaining above-ground floors are entirely for office purposes. The building will be awarded Platinum-level 2009 LEED Core & Shell Certification.
Then, a new office building will be implemented, consisting of 2 floors below-ground which will be used as garage and technical premises, with a gross surface area of 3,870 square metres per floor, and an above-ground area divided into three interconnected buildings that rise up 8, 11 and 14 floors respectively, with a gross surface area of 22.700 square metres. On the inside, the building opens up on two main halls, where the main staircases of the complex are located. The shape of the ground floor can thus allow both to divide the building in two big sections and to use one of the abovementioned halls, if case be, as the main one and, accordingly, the other one as the secondary one. The first floor of the complex has a hybrid shape, divided in office premises and meeting areas, while the remaining above-ground floors are entirely for office purposes. The building will be awarded Platinum-level 2009 LEED Core & Shell Certification.
- Contracting entityKryalos SGR S.p.A.
- Place Milano (MI) view map
- Work start date04/07/2018
- Type of workNuovo complesso direzionale
- DesignerPARK Associati